Just a quick update because we are actually going to get out to make some turns tomorrow.
Today was a lot more busy work, most of which I don’t even remember. I was sorting out some more wiring most of the time. I finished installing the 12V socket in the passenger wall. I drilled another hole in the van because I was annoyed at how the wires were running.
While I was being minimally productive, Sara made great progress on the cabinets. She got more polyurethane on everything and installed the drawer slides on all of the drawers.
Our snowboard trip tomorrow will finally run the fuel tank down to near empty so I can finish the heater. That will be exciting. Hopefully the successful kind of exciting. I also have the final (?) pieces of the electrical system coming tomorrow so this weekend should see the start of the real electrical build out. Stay tuned!